Renovation and maintenance
How to apply for help with asbestos removal and roof replacement in Poland
When replacing an asbestos cement roof in Poland, obtain separate estimates for safe removal and for making the roof weathertight again with a new covering. Your municipality’s funding rules specify whether it pays for dismantling, transport and disposal or only for collecting waste. Before commissioning work, establish when to submit the application and when a contract can be signed. Leave the sheets undisturbed and arrange removal by a qualified specialist. As at 1 November 2026, the earlier farm roofing schemes provide no basis for assuming that every homeowner can claim the cost of a replacement roof.

In this guide
Which costs can the scheme cover?
Depending on the local scheme, eligible work can include dismantling, collecting, transporting and disposing of asbestos-containing materials. Some schemes cover only the collection of waste that has already been removed. Check each item in the estimate against the eligible costs listed in the rules.
The owner may still have to pay for the replacement sheets, repairs to the roof frame and installation. Even a grant covering up to 100% of eligible costs applies only to the listed costs, subject to local limits and conditions. Establish these before signing a contract.
Where can you check whether applications are open?
Contact the municipal office responsible for the property. Ask whether it is accepting applications, who qualifies and which documents it needs. Find out whether the municipality appoints a contractor for several properties or reimburses individual owners. This affects both scheduling and who signs the contract.
Regional funding may be offered to municipalities, which then organise the work locally. A regional call for applications can therefore be addressed exclusively to local authorities. Check the rules for your property’s municipality and region before applying to a fund directly.
Does the PLN 40 per square metre rate apply to every roof?
The historical PLN 40 per square metre rate, capped at PLN 20,000, belonged to a Polish scheme for replacing roofing on eligible agricultural buildings. Applicants had to meet the scheme’s requirements for both the farm and the use of the building. The rate was never a general residential roofing allowance.
The second application round closed on 12 January 2024. Later notices about completion and payment deadlines concerned existing agreements. To establish which assistance you can apply for in November 2026, check the current call covering your property.
How can you prepare a complete application?
Gather the property details, evidence of your rights to the property and information about the asbestos-containing products. The scheme may ask for roof area and estimated waste mass. Ask the office which estimation method and forms it accepts. A conversion factor for a different sheet material can give a misleading result.
Check local requirements for reporting asbestos-containing products and recording their condition. Businesses and farms may need additional declarations. Keep copies of the application, proof of submission and subsequent agreements. Confirm the approved scope and eligible dates before work starts.
Why should a specialist remove the sheets?
Asbestos removal requires specialist controls and regulated waste handling. Do not cut, break or clean the sheets in ways that release dust. Leave them in place and commission a contractor competent to carry out the work under Polish regulations. Keep asbestos waste out of the ordinary rubble stream.
Confirm the notifications and waste transfer records required. Starting too early can make some costs ineligible, even if the contractor invoices them after the grant is approved. Schedule the application, award and works in the order required by the scheme and by the rules for asbestos removal.
How do you coordinate removal and reroofing?
Have the existing structure assessed before the covering comes off. Even lightweight T18 or T35 trapezoidal steel sheet must suit the supports, design loads and pitch. Cut-to-length or modular tile-effect steel may suit a different roof layout or the appearance you want for the building.
Agree the handover between the removal contractor and the roofer, including temporary weather protection. Price the underlay or other specified layers, flashings, fixings and drainage. If you plan to insulate, design the complete roof build-up. Provide a separate budget for reroofing regardless of the asbestos grant amount.
Which records should you keep afterwards?
Keep the paperwork specified by the scheme, proof of completion and records of waste transfer. Observe the claim deadline and update the municipality’s records if required. File the new roofing documentation with its warranty and maintenance instructions for future inspections and repairs.
Before commissioning work
Before placing an order, confirm which costs qualify, the first eligible date for expenditure and who appoints the contractor. Then calculate what you need for the new covering and any repairs to the roof frame.
Planning the removal and the new roof
Local funding can reduce asbestos disposal costs. Plan around the current municipal terms, safe specialist removal and a crew ready to install the new roof. Use those figures when setting your budget rather than an allowance from a closed programme.
7 branches. Materials closer to your project.

Free quote
Materials for your project
You may also find useful…
If you suspect that work on a building in Poland was unauthorised, compare what stands on the site with the approved documents.…
When planning the purchase of roofing and a roof renovation, it is worth separating two issues: the purchase of the materials themselves,…
If you plan to work on a roof in Poland, first describe exactly what will change. Replacing the covering, altering the structure…
When insulating a roof and walls, it is essential to establish which thermal requirements apply to the specific building envelope and project,…
Base cooperation with the construction manager on clear inspection points, documents and decision routes. In Poland, statutory responsibilities include directing construction, maintaining…
To estimate a completion date, ask each trade what needs to be ready before it can start. The roofing supplier needs reliable…
In Poland, the procedure for roof work depends primarily on what will change in the building. Replacing worn sheets, altering a timber…