Can you add insulation to an existing sandwich panel roof?

At a glance

An existing sandwich panel roof may be suitable for additional insulation when a cold store is converted into a heated workshop or the owner wants to reduce energy use. First establish what is already on the building. Identify the core material and panel thickness from drawings or product markings, check the supports and inspect the facings for corrosion, leaks and signs of delamination. If the core may be wet, establish how far the moisture extends before covering it. The retrofit design needs to account for the extra load, the ability of the roof to dry and the route rainwater will take at the new roof level.

Existing sandwich panel roof being surveyed before additional insulation is planned

Assess the condition of the existing roof

Consider the condition of the covering alongside its intended remaining service life. Adding insulation to a sound roof is a different undertaking from refurbishing one with widespread defects. In the latter case, replacing the panels may give a more predictable result. Factor in access for repairs and which existing components can be retained.

Estimate the additional thermal resistance

For a preliminary estimate, use R = d/λ. Suppose the existing roof has a U-value of 0.45 W/(m²·K). Adding 100 mm of insulation with a thermal conductivity of 0.022 W/(m·K) gives an extra resistance of about 4.55 m²·K/W. Adding this to the existing resistance of 1/0.45 and taking the reciprocal gives an indicative U-value of about 0.15 W/(m²·K).

This simplified example leaves out new thermal bridges, fastener effects, roof geometry and the condition of the existing assembly. For the actual design, determine each layer’s properties and apply the relevant corrections. Assess airtightness and the risk of condensation separately, even where the calculated U-value meets the target.

Plan the full build-up for insulation above the panels

A layer above the existing panels needs suitable bearing surfaces, fixings and a new means of keeping water out. The profiled metal facing may offer only partial support for insulation boards. The design should show how the chosen system carries loads and how the insulation is supported across the troughs.

Check whether fixings can reach the structure and, where bonding is proposed, whether the coating is sound. Metal facings, membranes and waterproofing layers all influence how the assembly dries. Inspect the existing panel joints before relying on the panels as a vapour control layer. Assess the completed roof as one assembly.

Assess moisture risk when insulating from below

Insulation fitted on the inside lowers the temperature of layers on its outer side. Warm, moist indoor air can leak through gaps and condense when it reaches a colder surface. Detail a continuous airtight layer around service routes and at the perimeter. Filling the available space with insulation leaves these junctions unresolved.

Specify the layers, their fixings and the required internal finish. If a ceiling void is proposed, include it explicitly in the design. Check the implications for the fire classification of the roof. In buildings with high humidity or intermittent operation, base the moisture assessment on the actual operating cycle.

PIR insulation boards for roof projects – free quote from SteelProfil

Check the extra load and redesign the edge details

The new insulation, secondary framing and roof covering all add weight. Have a structural engineer check the entire load path, including supports and connections. Assess wind uplift and the restraint of the new layers. Even lightweight insulation boards form part of an assembly whose total load must be checked.

Increasing the roof thickness changes levels at the eaves, ridge, walls and service penetrations. Adapt the flashings and drainage to the new section. Check the effective height of waterproofing upstands above the finished surface. Confirm that equipment and designated maintenance routes will remain accessible.

Compare upgrading with replacement and define the handover checks

Compare the complete insulation retrofit with the cost of replacing the covering. Include defect repairs, alterations to services, downtime and future maintenance. For each option, specify the target U-value, expected moisture conditions and which existing elements will stay. This puts the costs of the two finished roofs on the same basis.

Protect the work against rain and plan the sequence around the continued use of the building. Check that layers are dry before closing them in. At handover, inspect junctions, the continuity of seals and the fixings against the design. Keep as-built records for subsequent inspections, when much of the original roof will be out of sight.

Frequently asked questions

Can PIR insulation be bonded directly to the old metal facing?

Only if the designed system provides for bonding and the substrate, adhesive and fixing conditions have been checked. Assess the sheet profile, coating condition, wind loading and moisture exposure for the roof in question.

Will extra insulation stop condensation on the ceiling of an industrial building?

It can help once the cause has been identified. Air leaks, thermal bridges or excess moisture may be responsible. Check the details and ventilation and establish whether a roof leak also needs repair.

7 branches. Materials closer to your project.

Map of seven branches offering sandwich panels, PIR boards and sheet metal — Ecoprofil
  • SEROCK — Dzierżenin 34 E [map]
  • BŁONIE — ul. Sochaczewska 138A [map]
  • RADOM — ul. Grobickiego 8 [map]
  • ŁÓDŹ — Natolin 8 [map]
  • OLSZTYN — Barczewo, ul. Prosta 9 [map]
  • WROCŁAW — ul. Jerzmanowska 10C [map]
  • GORZÓW WLKP. — ul. Zielona 33/34 [map]

Check prices and availability: +48 500 409 109

Free quote

Materials for your project

You may also find useful…