Heated or unheated steel buildings: which does your operation need?
An unheated steel-framed building is not automatically worse than a heated one. It may be the right choice for materials and machines that do not require a constant temperature. The problem starts when the building standard is determined solely by the price of the envelope. First you need to establish the requirements of the goods, the equipment and the people. Only on that basis can the building envelope and services be selected. In a warehouse, not only temperature but also humidity and its fluctuations can matter. Some products need protection from frost, while others are sensitive to condensation. A steel-framed building for production must also meet the working conditions and the requirements of the process. Assumptions from a garage cannot be transferred to a room of continuous occupancy without reassessment.









