How do you plan a roof renovation and choose a new covering?
Start a roof renovation by identifying the cause of the problem and the condition of the structure. Replacing the sheets alone may not be enough if damp layers, leaks or damaged supports remain beneath them. Choose the new material for the complete roof build-up and the intended use of the loft. Include insulation, ventilation, flashings and drainage from the outset so the finished roof need not be reopened. An indoor water stain does not always show where water entered the covering; it can travel along layers and structural members. Inspect the junctions at chimneys, roof windows, valleys and edges. Also distinguish rainwater from condensation, which may result from air leakage or an unsuitable layer build-up.